Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Points and route controls
#2
(28-08-2019, 02:42 PM)tfly86 Wrote: Hi All,
Please can you provide some feedback on the 2013 control tables attached.

Regards

TF
I think you need to look a bit at the points. The basic bits are right (deadlocking and the routes that require them in positions).

However, your understanding of the "locked after..  until.." part needs some work.
Thinking about your entry for the points being locked after route set 112B(M). You have given the release condition of DJ clear or DH OCC for time. Given that, at the time of setting 122B(M), DJ is likely to be clear, what does your entry achieve? Also DH is on the approach to 112 so having set 112B(M) the train is on DH as it approaches the signal and the points. That does not sound like a occupation condition that you would want to be able to release the points that the train is about to move onto!

One thing that you have not mentioned is that the overlap for routes up to 112 can go either way through the points. If this is to be provided as a swinging overlap then given its simple arrangement, there is not really anything to record on this table, but I think it would be worth adding a note that you have spotted this. Alternatively, if the overlap is to be set and locked whichever way it lies when the route up to it is set, that would be a matter for recording on this table. So it is not wrong that you have not included it, but the examiner would not know whether that is your omission or your knowledge that has led to that. Give them the opportunity to give you marks!

As for the signals:105A(M)
This has an alternative class of route from the same signal (105A(W)) and this needs to be proved normal - although it is in the same direction, this goes in the opposing locking section under Route Normal.
Points called and detected - it is normal to list each end of points detected (214 A and B; 215 A and B). Same for the other route table.
In the tracks for the aspect, you have listed those in the route correctly, but I am not sure why you have put CB OCC for 180s. This would give approach release which is a) not called for in the layout and b) in this case would be 3 minutes before the signal clears which is an incredibly long time for A/L so indicates to the examiner that you have not really understood about how A/L timings are derived!
A small detail on the aspect sequence - Y->R is good, G->Y is good, but not the whole story. You have omitted the G->G.
In the approach locking section, I think this form of table is records the number or name of the route in the "Signal Cleared / Route Set". It is not a binary option of one or the other. The next column is for the look back conditions if comprehensive approach locking is provided - just having the berth track in here is not sufficient. If you are not sure what this means, look for some information on Approach Locking Lookback.
For the approach locking release, I think you have the right idea but have not recorded it right in this column form. The condition is "first and second track occupied THEN first clear and second occupied". You have written the first condition across the two columns and then done the same with the second condition below. So if you look down the column for first condition yours reads "CD OCC CD CLR" which is clearly impossible and the second condition reads "CE OCC CE OCC" which is tautologous! Same comment applies for other route.

As noted above, several of the same points apply to the other route. Here are a couple of other specific points:
Not strictly necessary, but it is likely that 219 and 217 points would be called normal as flank protection.
It is not stated on the layout, but you have assumed that the call on requires DA OCC and DB CLR. Depending on the operational context, the call on may be for a light engine in which case both occupied my be valid. What you have put here is not wrong, but again, you could clarify the assumptions that you have made.
Also, you have put DA being occupied for 30s before the aspect clears yet you already have the requirement that a route that has taken a train in there has DA timed for 30s before the route locking releases.

Peter
Reply


Messages In This Thread
Points and route controls - by tfly86 - 28-08-2019, 02:42 PM
RE: Points and route controls - by Peter - 31-08-2019, 11:59 AM
RE: Points and route controls - by tfly86 - 09-09-2019, 08:13 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)