Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
General query regarding record of design decisions
#4
Quick response would be design log. Slightly longer response is design log and record anything relevant on the design itself.

Taking a different viewpoint, all design decisions affect maintenance. However, "usual" decisions are not recorded and it is only exceptional/abnormal decisions that do require recording. It also depends on what, and why, you are trying to log some information. If it is to do with enabling a maintainer to maintain their equipment more efficiently then it may be better to log it and include it in any training given. If it is a safety issue then standards (in mainline UK) state very clearly what you need to do under CDM. It also details who is the designer (not always a designer) and who is responsible for recording the information and where!

One viewpoint...
1) technical decision - design log (and potentially on design).
2) engineering or safety decision - engineers' hazard log.
3) contractual/commercial/safety - project hazard log.
Le coureur
Reply


Messages In This Thread
RE: General query regarding record of design decisions - by Jerry1237 - 24-04-2017, 11:45 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)