1999 Layout
#9
Dear PJW

I wish to try answering method of working. It would be good to get feedbacks more.

1. The method of block working on the main lines and branch lines should be shown, together with any interface arrangements.
Main lines and branch lines use track circuit block (TCB)
Is it good enough?

2. The method of working between the stone terminal and station B should be shown.
Freight trains from station B to Stone terminal C via down branch
-loco and wagon parks at stone terminal
-loco will go to headshunt and go to Run Round and go to Cripple Siding and go back to Stone Terminal
-loco and wagon leave stone terminal by using signal 162 to down Goods Loop via down branch(Back to station B)

3. The method of working over the single line viaduct at E should be shown.
-Any freight or passenger train from Down Main park at 111(Standage 400m is proposed).
-A train from UP Main can run to station B via viaduct while the other train from Down Main stands still.
-Once the train from UP Main clear viaduct E(Last Track CN clear) the train from Down can go to section 'F'

_____________________________________________

Could you please explain a bit about slot control on 151, 309, 310 at Stone bunker? I am totally blank this topic?

Best regards, Arnut
Reply


Messages In This Thread
1999 Layout - by steve - 23-06-2008, 01:09 PM
RE: 1999 Layout - by PJW - 23-06-2008, 10:33 PM
RE: 1999 Layout - by steve - 24-06-2008, 01:36 PM
RE: 1999 Layout - by asrisaku - 18-08-2014, 03:33 AM
RE: 1999 Layout - by PJW - 19-08-2014, 09:43 PM
RE: 1999 Layout - by asrisaku - 21-08-2014, 03:28 AM
RE: 1999 Layout - by PJW - 25-08-2014, 04:31 PM
RE: 1999 Layout - by asrisaku - 27-08-2014, 12:16 PM
RE: 1999 Layout - by asrisaku - 29-08-2014, 05:18 PM
RE: 1999 Layout - by PJW - 31-08-2014, 11:00 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)