Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
2009 CTs on IRSE 2012 tables
#7
Points:
you have omitted the foul tracks from "Train Detection Clear" in both cases. Suggest you have a look at Reuben's Model Answer above and see if you understand why they are included.
On both points tables you've got (416B(M) with 237N) but omitted (416B(M) with 237R) which also affects the points. Similarly with 412, 414, 418. As the control appears on your route table for 416B(M) it should appear on the points table.
For 236 points, you have [418C(S) with 238R] overlap, however, I don't believe there is a swinging overlap at 382 over the points reverse.
Reply


Messages In This Thread
2009 CTs on IRSE 2012 tables - by dorothy.pipet - 29-07-2013, 08:03 AM
RE: 2009 CTs on IRSE 2012 tables - by PJW - 30-07-2013, 06:18 AM
RE: 2009 CTs on IRSE 2012 tables - by reuben - 30-07-2013, 04:45 PM
RE: 2009 CTs on IRSE 2012 tables - by asrisaku - 08-04-2014, 12:54 PM
RE: 2009 CTs on IRSE 2012 tables - by dorothy.pipet - 11-04-2014, 03:41 PM
RE: 2009 CTs on IRSE 2012 tables - by asrisaku - 17-04-2014, 03:06 AM
RE: 2009 CTs on IRSE 2012 tables - by asrisaku - 19-04-2014, 06:57 AM
RE: 2009 CTs on IRSE 2012 tables - by asrisaku - 20-04-2014, 08:46 AM
RE: 2009 CTs on IRSE 2012 tables - by asrisaku - 21-04-2014, 06:02 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)