Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Mod 3 2011 Layout - Train working
#1
Dear Memmbers,

In Mod 3 2011 layout the train working are given as,

1.Trains E or W to P stop on Up Main, run round via Down Main

2.Trains P to W or E stop on Down Main, run round via Up Main.

According to the signalling arrangement in the layout, I have given the train sequence (traverse )route

1.Trains E or W to P stop on Up Main, run round via Down Main
Loco detached
a. 217A(M) - Loco from 217 to 219

b. 218B(S) - Loco from 218 to 214

c. 214A(M) - Loco from 214 to 342

d. 345B(S) - Loco from 345 to 349

e. 349A© - Loco from 349 to 217 (train occupied), loco attached

Towards P station, route 212D(M)

2.Trains P to W or E stop on Down Main, run round via Up Main.
Loco detached
a. 215 - 219

b. 218A(S) - Loco from 218 to 212

c. 212A(M) - Loco from 212 to 342

d. 345A(S) - Loco from 345 to 347

e. 347A© - Loco from 347 to 215 (train occupied), loco attached

Towards W station, route 214C(M)

Towards E station, route 214A(M)

To understand the run round concept required in Mod 2, I tried with this layout.

Kindly check & give your comments for my enhancement.

Regards,
NJK
Reply


Messages In This Thread
Mod 3 2011 Layout - Train working - by NJK - 13-07-2012, 01:07 PM
RE: Mod 2 2011 Layout - Train working - by PJW - 13-07-2012, 07:23 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)