Work completed was a little revision and the headway question of M2 2009 under exam conditions.
Homework set:
Revise model answer of M2 2009 and re-do
Advanced homework:
M2 2009 with Ht at 1.5 minutes for the fast following fast passenger train.
Once again, many thank to Reuben for providing much of the educational material and model answer to M2 2009 (headway).
Jerry
Homework set:
Revise model answer of M2 2009 and re-do
Advanced homework:
M2 2009 with Ht at 1.5 minutes for the fast following fast passenger train.
Once again, many thank to Reuben for providing much of the educational material and model answer to M2 2009 (headway).
Jerry
(07-01-2011, 09:35 AM)Jerry1237 Wrote: Derby 12th January 2011
Agenda is:
Revision, mock headway exam (under exam conditions), stopping headway.
Homework:
None set.
16:20 for a 16:30 start at DeltaRail, 2 St Christopher's Way, Derby.
All welcome from any background, company or with level of knowledge but. We are looking for regular attendees. Please let us know if you want to come in advance if possible.
See you there,
Jerry
PS: Networking afterwards in local establishment.
Le coureur