12-01-2011, 03:25 PM
(12-01-2011, 01:13 PM)interesting_signal Wrote:(11-01-2011, 11:47 PM)PJW Wrote:(11-01-2011, 02:41 AM)ivanutd Wrote: Hello PJW,I don't think that candidates have ever yet been asked to do a Control Table for a Ground Frame but there is always a first time.
Also on 1998 Layout, there is a connection line between platforms 2 and 3 which is operated by a GFR - i have never done a CT for a GFR, can you please let me know what would be required for this in the exam and how to approach it?
Has a level crossing control table ever been asked for?
Certainly not as part of the "Control Table" question on the paper; I think that there was a "written question" some many years back that effectively asked for the appropriate controls to be specified and would have largely been answered by the production of a Control Table.
PJW

